allbet欧「ou」博「bo」真 zhen[人(ren)客 ke[户《hu》端‘duan’www.aLLbet8.vip}是 shi[欧〖ou〗博《bo》集「ji」团{tuan}的‘de’官「guan」方《fang》网‘wang’站《zhan》。欧“ou”博‘bo’官 guan[网(wang)开《kai》放【fang】Allbet注‘zhu’册、Allbe代〖dai〗理「li」、Allbet电『dian』脑〖nao〗客“ke”户【hu】端《duan》、Allbet手机【ji】版〖ban〗下{xia}载【zai】等「deng」业务(wu)。

,Sarawak Consolidated Industries Bhd CEO Rosland Othman says Ennova was to bear all construction costs of the poles, including the rental of each erected pole in accordance with the agreed rental price between it and DBKL. – SCIB website pic, June 13, 2022.

SARAWAK Consolidated Industries Bhd (SCIB) today clarified that its unit SCIB Properties Sdn Bhd (SCIBP) has been appointed as a sub-contractor to undertake an engineering, procurement, construction and commissioning contract in connection with the Integrated Smart Lamp Pole Replacement project for Kuala Lumpur City Hall (DBKL) by Ennova Sdn Bhd. 

SCIB managing director/chief executive officer Rosland Othman said SCIBP’s scope of work included but was not limited to site clearing, excavation and reinforced concrete footing structure, laying all reinforcement concrete, bolts and nuts, and plates on all mild steel structures, with the poles, fittings and accessories to be supplied by Ennova.

“The scope includes perimeter chain-link fencing works, mild steel gates and setting up, earthworks, levelling, setting out, making point, and other related works, mechanical and engineering works such as wiring, switch boxes, connection to conduits, lay ground earth cable as well as installation of monopole,” he said in a statement today. 

Rosland said Ennova was to bear all construction cost of the poles, including the rental of each erected pole in accordance with the agreed rental price between it and DBKL.

“We are unaware of any funding or financing arrangement for the contract by DBKL,” he added.

Yesterday, DBKL had denied appointing SCIB to replace 200 lamp posts in the Klang Valley as claimed.

This statement comes in the wake of reports that a contract worth RM30.75 million was awarded to the Sarawak-based precast concrete product maker via Ennova for the project. – Bernama, June 13, 2022.


转(zhuan)载“zai”说“shuo”明《ming》:本『ben』文(wen)转《zhuan》载‘zai’自 zi[Sunbet。 欧博开户声明:该文看法仅代表作者自己,与本平台无关。转载请注明:allbet欧博真人客户端(www.aLLbet8.vip)_Sarawak company clarifies sub-contractor role in *** art lamp pole project
发布评论

分享到:

Bulk of RM6 billion payment for LCSs spent on equipment order, LTAT chief says
2 条回复
  1. 澳洲幸运5彩票开奖网(www.a55555.net)
    澳洲幸运5彩票开奖网(www.a55555.net)
    (2022-07-04 15:56:44) 1#

    此次帮扶慰问既是年头流动的主要延续,也是推进协议落实的有力行动。山西边检总站也将以此次帮扶慰问为契机,深入领会戍边民警头脑、事情、生涯状态,动态掌握民警本人及家庭、支属存在的现实难题,进一步完善精准帮扶的制度机制和方式行动,连续凝聚警地联手、稳边固防的壮大协力。马马虎虎,反正不差

  2. USDT第三方支付(www.caibao.it)
    USDT第三方支付(www.caibao.it)
    (2022-08-13 00:06:48) 2#

    登1登2登3代理先占坑等会看。

发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。